Staff Member
Diamond Supporter
Platinum Supporter
Bronze Supporter
- Messages
- 12,595
- Reactions
- 18,041
- Thread Starter
- #21
What's the due date then so we can be prepared for the expense?
The lowers were shipped today, so we should have the first batch shortly after
I should have a more concrete answer soon.
I'm in.
I appreciate that you are trying to keep the price low for the group. However, be equitable to yourself. You are the one fronting this on your CC's.
Thank you, I appreciate that.
What does the port side look like? Same logo.
I kinda want one, but I want to see a picture of the port side of the receiver
The ones on the Anderson website aren't very clear, so I'll link you to the Google results page. I'd post the images here but most are copyrighted by the big retailers.
Google Image Results