- Messages
- 2,540
- Reactions
- 1,593
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I'm thinking about putting in a Form 1 on my trust for a suppressor now (before the proposed regulations take effect), to be physically built at some point in the future. Is there a time limit on how long you have to build the item described on a Form 1?
I believe that you have to have all the specs and the SERIAL # before you submit the Form 1.
Right, but how long do I have to actually physically make it? I can submit a form 1 that lists a random s/n I made up and a certain length and then take forever to make it I suppose?
I know you can actually make one as a private individual if you have a stamped form 1, I'm just curious if I have to make it within a certain period of time after the stamp is issued.