Gold Supporter
- Messages
- 5,269
- Reactions
- 13,448
It may take them a while to get materials together and engrave the Lane 4 name, so it may not be soon. I'm open again mid June, after the Darrington Pit cleanup, and kind of thinking to take a jug of water up there.If nobody can do this before the end of May, let ODF know I can take care of it as soon as I'm back.