Silver Supporter
- Messages
- 21,260
- Reactions
- 80,615
Lots of Hanger time, Got my new engine and prop set up for the Plane, and need to pull the old set up and set it up so I can figure out my thrust angle correction and fab new mounts. My new landing gear arrived from France and a bunch of parts that were ether sourced or fabbed locally need to be installed. Wings are converted and have the new struts installed and adjusted! Then the FAA inspection and sign off before flight testing! Really looking forward to the improved flight performance and the cool factor!
