I'm building a blasting cabinet on the cheap, What I still need:
*clear plexiglass sheet, 1/4" x 21" x 21"(min)
*18" flourescent light
*8' of weather stripping foam tape
*4"-6" dia PVC pipe scraps 10" long (min) and fittings (caps, unions)
if you have these items and are willing to part with them for garage sale prices I will be happy to take them off your hands
*clear plexiglass sheet, 1/4" x 21" x 21"(min)
*18" flourescent light
*8' of weather stripping foam tape
*4"-6" dia PVC pipe scraps 10" long (min) and fittings (caps, unions)
if you have these items and are willing to part with them for garage sale prices I will be happy to take them off your hands